Guide

    What does a second-story addition cost in Los Angeles?

    No honest number exists before the structural look, so this page gives you the next best thing: what moves the number, in the order it usually moves it, and how the written figure arrives. An owner who knows the drivers reads a quote the way I do.

    I am Sebastian Moreno Rivera, the owner of Build And Decor Construction. Every second story I price starts with the house that exists, not with a rate per square foot.

    The structure under the new floor

    The first driver, and the one that is invisible in the finished house. A second floor sends new weight down through every wall and footing below it. Older Los Angeles houses were often built in stages, and what holds them up is not always what the drawings on file say. The answer can be new footings doweled into the old ones, grade beams, interior shear walls with hold-downs, new posts and beams, or piers on a sloped lot.

    None of that work shows in the finished house, and all of it belongs in the number. This is why a per-square-foot figure quoted before anyone has seen the footings is a guess. Two houses of the same size can need very different work underneath. Can your house carry a second story walks through what the evaluation looks at.

    The area, and the shape of it

    A full second floor over the whole footprint and a partial second story over the rear are different projects. The partial one has fewer square feet and less roof to rebuild, and it keeps the roofline low toward the street. Both need the stair, and the stair takes floor area downstairs that was doing something else.

    The roof shape moves the number too. A simple gable over a rectangle is one kind of framing; hips, dormers and a tie-in to an existing wing that stays are another. The tie-in is where additions succeed or fail, and it is priced as the careful work it is.

    The lot

    A hillside lot brings soils work, a geotechnical engineer early, piers or grade beams, and street access that sets how material arrives and how big the crane day is. A flat lot on a wide street is the simplest case. A lot in a Historic Preservation Overlay Zone can set the materials and the massing the district will accept, which reaches into the finish level before you have chosen anything.

    Design, engineering and plan check

    Your architect's drawings and your structural engineer's calculations are design-stage items with their own fees, and they come before the construction number exists. Plan check and permit fees are set by the City, and the number of correction cycles depends on how complete the submittal is. On a complicated lot a preliminary plan check meeting with an LADBS plan check engineer answers questions before they become corrections.

    Finishes, and living in the house

    The finish level is the driver you control most: windows and glazing, the baths, flooring, built-ins, the exterior finish that has to match or replace what is there. Living in the house during the build adds phasing, a sealed barrier at the stair and a dedicated crew entry, and it saves you rent. Moving out saves phasing and costs rent. Either is a line in the scope, and you choose it.

    How the written number arrives

    The first on-site visit is free: I walk the house, read the lot on ZIMAS, and tell you what the lot allows. Exposing the foundation where it matters is the structural look, a scoped step we agree on before anyone digs. Design follows if you want it. After the structural look and the plan review you get a written scope with stage-by-stage pricing, so you see what each phase covers before you approve anything, and each payment stage is tied to a milestone you can verify on site.

    To set that number against the price of buying bigger on your street, the build-up-or-buy-bigger worksheet takes your own figures. The full picture of the work is on the second-story additions page.

    See your house with a second story

    Send me your address and two or three photos of the house. I send back a feasibility read in writing: what the zoning allows above your roof, what the lot adds, what a house of its age and type usually needs to carry a new floor, and a simple massing sketch of the new floor on your house. I read every request myself.

    Frequently Asked Questions